System and method for realizing transformation of thermal power unit based on combined high-parameter and low-parameter molten salts

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12221906
APP PUB NO 20240035396A1
SERIAL NO

18350306

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for realizing transformation of a thermal power unit based on combined high-parameter and low-parameter molten salts includes a high-parameter molten salt energy storage system, a low-parameter molten salt energy storage system and a thermal power unit. The high-parameter molten salt energy storage system and the low-parameter molten salt energy storage system include an electric heater for heating a molten salt, and an electric energy input end of the electric heater is connected with an electric energy output end of the thermal power unit. The low-parameter molten salt energy storage system includes a low-parameter molten salt heat absorption loop and a low-parameter molten salt heat release loop, and the high-parameter molten salt energy storage system includes a high-parameter molten salt heat absorption loop and a high-parameter molten salt heat release loop.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • XI'AN THERMAL POWER RESEARCH INSTITUTE CO., L

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fu, Kangli Xi'an, CN 2 0
Han, Wei Xi'an, CN 308 2715
Ji, Haimin Xi'an, CN 3 0
Lu, Xu Xi'an, CN 64 105
Song, Xiaohui Xi'an, CN 11 8
Yao, Mingyu Xi'an, CN 3 0
Yu, Zaisong Xi'an, CN 6 0
Zhao, Liang Xi'an, CN 669 2735

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00