Boron-containing compound and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12221457
APP PUB NO 20220135596A1
SERIAL NO

17429103

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a boron-containing compound comprises a step of reacting a first raw material compound having a carbon-carbon double bond with a second raw material compound having a conjugated diene skeleton in the presence of a metal catalyst to obtain a boron-containing compound having a 1,4-diene skeleton, wherein at least one of the first raw material compound and the second raw material compound has a boron-containing group bonded to a carbon atom constituting the carbon-carbon double bond or the conjugated diene skeleton, and the boron-containing compound has the 1,4-diene skeleton and the boron-containing group.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NATIONAL UNIVERSITY CORPORATION TOKYO UNIVERSITY OF AGRICULTURE AND TECHNOLOGY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirano, Masafumi Fuchu, JP 1 0
Kiyota, Sayori Fuchu, JP 1 0
Komine, Nobuyuki Fuchu, JP 1 0
Shimada, Keita Fuchu, JP 9 82

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00