Large-scale power generation method using electric locomotive-driven generators

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12221137
APP PUB NO 20240343273A1
SERIAL NO

18423353

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A large-scale power generation method using electric locomotive-driven generators includes the following steps: step 1: setting up a circular railway, and running at least 10 electric locomotives on the circular railway; step 2: providing one or two 20 MW or 30 MW generators in each carriage; step 3: providing a multi-stage double-gear accelerated transmission device on a wheel axle, and driving a generator rotor to reach a rated speed for electricity production; and step 4: grid-connecting electricity produced by the generators, and allowing a small part of the produced electricity to pass through a shunt circuit to become a driving force for the continuous operation of the electric locomotives. And therefor the electromechanical interaction is formed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Su, Ping Shaanxi, CN 17 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00