Multilayer facer

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12220895
APP PUB NO 20240227362A1
SERIAL NO

18613214

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Calculated Rating
US Family Size
Non-US Coverage

Abstract

See full text

A glass facer for a constructions board includes a first non-woven layer of coarse fibers and a second non-woven layer of coarse fibers and microfibers. The glass facer also includes a binder that simultaneously binds or adheres the coarse fibers of the first non-woven layer together, the coarse fibers and the microfibers of the second non-woven layer together, and the first non-woven layer to the second non-woven layer. The first non-woven layer has a porosity and air permeability that enables the first non-woven layer to absorb a material of the construction board when the glass facer is positioned atop the construction board during manufacture of the construction board. The second non-woven layer is configured to block the material of the construction board from passing through the glass facer to an exterior surface of the second non-woven layer so that the material is not externally visible.

First Claim

See full text

Other Claims data not available

Family

Patent Owner(s)

  • JOHNS MANVILLE

International Classification(s)

loading....
  • 2024 Application Filing Year
  • B29C Class
  • 1877 Applications Filed
  • 102 Patents Issued To-Date
  • 5.44 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bennett, Glenda B Toledo, US 11 131
Matthews, Thomas Liberty Center, US 20 186
Nandi, Souvik Waxhaw, US 62 278

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • B29C Class
  • 0 % this patent is cited more than
  • < 1 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges1938101 - 100100200300400500600700800900100011001200130014001500160017001800190020002100

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036