Method and apparatus for manufacturing a formed article of a composite material

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12220883
APP PUB NO 20220266546A1
SERIAL NO

17630770

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and apparatus for manufacturing a formed article of a composite material. The formed article is manufactured by heating and pressurizing a thermoplastic resin material and fabric material. The method includes a preforming process in which the material to be formed is put in a preforming mold with a release sheet arranged between the material and a part of the preforming mold. The material is heated and pressurized to impregnate the thermoplastic resin material into the fabric material, thus forming an impregnated intermediate material. Then, in a transport process the impregnated intermediate material in a heated state is taken out from the preforming mold with the release sheet left attached thereto, and transported. Finally there is a forming process in which the impregnated intermediate material is accommodated in the forming mold and the impregnated intermediate material is formed into the formed article of the composite material by pressurizing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FUKUI PREFECTURAL GOVERNMENT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaechi, Shin Fukui, JP 3 5
Kawabe, Kazumasa Fukui, JP 21 212

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00