Additive manufacturing system
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
Feb 11, 2025
Grant Date -
Jan 5, 2023
app pub date -
Sep 8, 2022
filing date -
Sep 8, 2022
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
An additive manufacturing system is disclosed for use in fabricating a structure. The additive manufacturing system may include a print head configured to discharge a material, a first structure, and a second structure. The first structure may be configured to move the print head within a plane during discharge of the material. The second structure may be configured to move the print head within the plane during material discharge, the second structure being movable together with the print head by the first structure.
First Claim
all claims..Other Claims data not available
Family
Country | kind | publication No. | Filing Date | Type | Sub-Type |
---|
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
- CONTINUE COMPOSITE INC.
International Classification(s)

- 2022 Application Filing Year
- B29C Class
- 4040 Applications Filed
- 1466 Patents Issued To-Date
- 36.29 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Overby, Andrew John | Coeur d'Alene, US | 31 | 27 |
# of filed Patents : 31 Total Citations : 27 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- B29C Class
- 0 % this patent is cited more than
- < 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Aug 11, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Aug 11, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 11, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
