Mechanical arm and control method therefor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12220191
APP PUB NO 20240164855A1
SERIAL NO

18283181

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This application provides a robotic arm and a control method therefor. The robotic arm comprises a spatial positioning mechanism, a planar motion mechanism and a connection and rotation joint connecting the spatial positioning mechanism and the planar motion mechanism. The space positioning mechanism comprises a base, and a joint mechanism including multiple joints, with the joint at a head end thereof installed onto the base, and the joint at a tail end rotatably connected to the connection and rotation joint; a tail end of the planar motion mechanism is connected to a surgical instrument. Perpendicular line of a plane where the planar motion mechanism is located is perpendicular to rotation axis of the connection and rotation joint; and the intersection between the rotation axis and axis of the surgical instrument is an active remote-center-of-motion point, which facilitates setting of the active remote-center-of-motion point and reduces occurrence of multi-arm collision.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AGIBOT MEDTECH (SUZHOU) CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Hao Jiangsu, CN 110 359
Xu, Min Jiangsu, CN 307 1995

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 11, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00