Method for producing piezoelectric actuator

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12219876
APP PUB NO 20220263010A1
SERIAL NO

17736121

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a piezoelectric actuator including forming a vibration plate, forming a first electrode on the vibration plate, forming a piezoelectric layer on the first electrode, and forming a second electrode on the piezoelectric layer, wherein the forming the vibration plate has a single layer forming step including forming a metal layer containing zirconium by a gas phase method, and forming a metal oxide layer by firing the metal layer, the single layer forming step is repeated, thereby forming the vibration plate in which the metal oxide layers are stacked, and the metal oxide layer has a thickness less than 200 nm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEIKO EPSON CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aimono, Takanori Matsumoto, JP 45 170
Itayama, Yasuhiro Kai, JP 29 46
Koike, Harunobu Matsumoto, JP 23 2
Nakayama, Masao Shiojiri, JP 119 881
Shimizu, Toshihiro Fujimi, JP 171 1487
Sumi, Koji Shiojiri, JP 90 844
Takabe, Motoki Shiojiri, JP 163 350

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00