Power conversion device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12218606
APP PUB NO 20240128887A1
SERIAL NO

18276274

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first voltage control circuitry controls a first representative value, i.e., an average-value corresponding value of DC capacitor voltages of all converter cells to follow an overall voltage command value. A phase balance control circuitry controls second representative values, i.e., average-value corresponding values of DC capacitor voltages of the converter cells in leg circuits for respective phases to follow the first representative value. A positive-negative balance control circuitry controls deviations of third representative values, i.e., average-value corresponding values of the DC capacitor voltages of the converter cells in the positive and negative arms of the leg circuits for respective phases to become zero between the positive and negative arms. An individual balance control circuitry controls DC capacitor voltages of all the converter cells to follow the third representative values.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MITSUBISHI ELECTRIC CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Toshiyuki Tokyo, JP 97 493
Kajiyama, Takuya Tokyo, JP 35 75
Nakayama, Akito Tokyo, JP 11 8
Tanaka, Miwako Tokyo, JP 12 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00