Electrical connector and cable grounding structure thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12218471
APP PUB NO 20230411872A1
SERIAL NO

17903958

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical connector and a cable grounding structure thereof are disclosed. A grounding structure is bridged between a connection body of the electrical connector and each cable, and includes a bridging portion, at least one clamping portion, at least one docking portion, and an elastic portion. The clamping portion is disposed on the bridging portion for clamping a covering layer of each cable, and the docking portion is extended from the bridging portion toward the connection body and electrically connected to connection body, and the elastic portion is attached and pressed against the covering layer of each cable, so as to provide good grounding contact and prevent the issue of skewing the cables and other factors that affects the soldering yield.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JESS-LINK PRODUCTS CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Ching-Hung New Taipei, TW 18 17
Yuan, Ming-Yang New Taipei, TW 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00