Device and method for variable signal attenuation in wireless communication system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12218397
APP PUB NO 20240128625A1
SERIAL NO

17769447

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a 5th generation (5G) or pre-5G communication system for supporting a higher data transmission rate than a 4th generation (4G) communication system such as Long-Term Evolution (LTE). The present disclosure provides a device for variable signal attenuation equipped in a stack-up structure inside an RFIC. The device for signal attenuation comprises: a first transmission line positioned on a first layer inside the RFIC; a second transmission line positioned on a second layer, which is adjacent to the first layer, and electromagnetically coupled to the first transmission line; and a control unit. The first transmission line comprises an impedance control unit on one side. The control unit can variably control the impedance control unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
An, Kyuhwan Gyeonggi-do, KR 9 2
Kang, Daehyun Gyeonggi-do, KR 11 21
Minn, Donggyu Gyeonggi-do, KR 5 0
Yoon, Youngchang Gyeonggi-do, KR 17 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00