Anti-fuse and fuse structures for improving the functionality of qubit circuits

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12218048
APP PUB NO 20240113015A1
SERIAL NO

17936845

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of constructing a superconducting switch includes depositing a thin sacrificial layer on top of a substrate. The sacrificial layer is patterned to remove portions of the sacrificial layer except at a first portion of the substrate. A superconducting metal layer is patterned on top of the substrate and on top of the sacrificial layer. The superconducting metal layer is patterned to form a superconducting metal line over the sacrificial layer. The patterned sacrificial layer is etched from under the superconducting metal line to release the metal line from the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • IBM CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adiga, Vivekananda P Ossining, US 50 87
Budd, Russell A North Salem, US 103 2044
Gates, Stephen M New York, US 111 4627
Rettner, Charles Thomas San Jose, US 24 289

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00