Doped semiconductor layer forming method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12217964
APP PUB NO 20210184073A1
SERIAL NO

17105182

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of obtaining a doped semiconductor layer, including the successive steps of: a) performing, in a first single-crystal layer made of a semiconductor alloy of at least a first element A1 and a second element A2, an ion implantation of a first element B which is a dopant for the alloy and of a second element C which is not a dopant for the alloy, to make an upper portion of the first layer amorphous and to preserve the crystal structure of a lower portion of the first layer; and b) performing a solid phase recrystallization anneal of the upper portion of the first layer, resulting in transforming the upper portion of the first layer into a doped single-crystal layer of the alloy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • COMMISSARIAT À L'ÉNERGIE ATOMIQUE ET AUX ÉNERGIES ALTERNATIVES

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bono, Hubert Grenoble, FR 34 365
Maffini, Alvaro Virginie Grenoble, FR 1 0
Simon, Julia Grenoble, FR 9 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00