Electrical network having fault protection control

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12217919
SERIAL NO

17599076

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical network includes feed-in devices, loads, and a distribution grid, which is arranged therebetween and comprises at least one busbar and at least one device for opening or closing a DC circuit. The at least one device includes: an electric switch for opening or closing the DC circuit; a fault current detection device; a trigger unit; a precharging device; and a control unit for automatically closing the electric switch after the precharging process. The electric switch opens the DC circuit via the trigger unit if a fault current is detected by the fault current detector, and the precharging device restores the voltage on the busbar prior to closing the electric switch. Multiple loads can be individually electrically separated via a respective electromechanical switch, and multiple loads can be electrically separated as a group via the at least one device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SIEMENS AKTIENGESELLSCHAFT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhu, Yi Kuemmersbruck, DE 173 554

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00