Efficient integrated circuit simulation and testing

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12216976
APP PUB NO 20220012395A1
SERIAL NO

17485168

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method comprising using at least one hardware processor for: running a Monte Carlo simulation of possible integrated circuit (IC) process variations of each of a plurality of IC cell types, wherein each of the plurality of IC cell types is defined by multiple specific transistors and multiple specific interconnects; based on the results of the Monte Carlo simulation, creating a library of IC cell types and their corresponding behavioral values for each of the possible IC process variations, and storing the library in a non-transient memory; receiving an IC design embodied as a digital file; correlating the received IC design with the library; and predicting a frequency distribution and a power distribution of ICs manufactured according to the IC design.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PROTEANTECS LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cohen, Shai Haifa, IL 50 432
David, Yahel Kibbutz Gazit, IL 17 32
Fayneh, Eyal Givatayim, IL 64 327
Landman, Evelyn Haifa, IL 39 110
Talker, Yair Binyamina, IL 9 44
Weintrob, Inbar Givat-Ada, IL 21 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00