Eyewear assembly having an energy dispersion mechanism

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12216340
APP PUB NO 20220269104A1
SERIAL NO

17703129

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy dispersion mechanism can be integrated into the eyewear design to incorporate a more resilient lens holding structure that can disperse the energy received during an impact and retain the lens in place. The energy dispersion mechanism comprises an impact dispersing material seated within a groove of a first frame portion, the impact dispersing material extending beyond the first frame portion to form a nose bridge which joins the first frame portion to a second frame portion; and the impact dispersing material is seated within a groove of a second frame portion. The impact dispersing material may be overmoulded on the eyewear to allow efficient manufacturing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brousseau,, Jr Guy Marieville, CA 20 90
Sheldon, Brent Miami, US 118 6466

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00