Fail-safe operating method for a decentralized power generation plant

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12216178
APP PUB NO 20220373613A1
SERIAL NO

17838630

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Calculated Rating
US Family Size
Non-US Coverage

Abstract

See full text

A fail-safe operating method for a decentralized power generation plant DG includes determining a leakage capacitance of a generator of the DG before connecting the DG. The method also includes comparing the determined leakage capacitance with a predetermined first limit value, and connecting the DG to a grid only if the determined leakage capacitance is smaller than the predetermined first limit value. A decentralized power generation plant is configured to perform the method.

First Claim

See full text

Other Claims data not available

Family

Patent Owner(s)

  • SMA SOLAR TECHNOLOGY AG

International Classification(s)

loading....
  • 2022 Application Filing Year
  • H02J Class
  • 4919 Applications Filed
  • 1771 Patents Issued To-Date
  • 36.01 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Putz, Martin Kassel, DE 8 14
Tschendel, Christian Kassel, DE 4 11
Viotto, Michael Kassel, DE 8 380

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • H02J Class
  • 0 % this patent is cited more than
  • < 1 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges12710010020030040050060070080090010001100120013001400

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036