Station and method for measuring airborne molecular contamination

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12216031
APP PUB NO 20230221220A1
SERIAL NO

17907473

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A measurement station for measuring airborne molecular contamination includes at least one gas analyser, at least two controllable isolation valves connected in parallel to the input of the at least one gas analyser, a conditioning pump, at least two calibrated orifices connected in parallel to the input of the conditioning pump, at least one distributor to connect each controllable isolation valve with, on one side, a sampling line and, on the other side, a calibrated orifice, and a control unit linked to the controllable isolation valves. The control unit commands the opening or the closing of the controllable isolation valves in order to be able to connect the at least one gas analyser with at least one sampling line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • PFEIFFER VACUUM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bellet, Bertrand Annecy, FR 7 17
Bounouar, Julien Annecy, FR 13 49
Le, Barillec Olivier Annecy, FR 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00