Air conditioning system and transportation system including same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12215908
SERIAL NO

18816006

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air conditioning system is provided. The air conditioning system includes an air compressor, a battery, a generator, a blower, and a turboexpander. The air compressor generates pressurized air from ambient air. The battery is for powering the air compressor motor. The generator is electrically connected to the battery. The turboexpander includes a drive shaft, a turbine wheel coupled to the drive shaft, and an expander coupled to the drive shaft. The pressurized air provides a source of kinetic energy to directly cause the turbine wheel to rotate and generate boosted air from the pressurized air, and the boosted air from the turbine wheel is configured to be received in the expander wheel and directly cause the expander wheel and the drive shaft to rotate together with the turbine wheel, thereby generating expanded and cooled air in the expander wheel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THEVU LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Primbas, George Concord Township, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00