Filling station for pressurized fluids

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12215830
APP PUB NO 20230194051A1
SERIAL NO

18068841

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A filling station for pressurized fluids has a storage container and a dispenser supplied thereby, comprising a high-pressure path and a low-pressure path. The storage container is partitioned into separate sections, which are each connected to the input of a high-pressure pump via a first switching valve and to the output of said high-pressure pump via a second switching valve. The first or second switching valves are connected on their pump sides to the low-pressure path of the dispenser via a third switching valve. The output of the high-pressure pump supplies a high-pressure reservoir via a fourth switching valve, which high-pressure reservoir is connected to the high-pressure path of the dispenser via a fifth switching valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • WOLFTANK HYDROGEN GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lechthaler, Markus Bozen, IT 17 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00