Heat exchanger(s) for recovering water and/or heat energy from turbine engine combustion products

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12215620
APP PUB NO 20240301823A1
SERIAL NO

18119154

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A turbine engine with an axis is provided. This turbine engine includes a fan section, a turbine engine core, a bypass flowpath, a recovery system and a core flowpath. The turbine engine core is configured to power the fan section. The turbine engine core includes a core compressor section, a core combustor section and a core turbine section. The bypass flowpath is fluidly coupled with and downstream of the fan section. The recovery system includes an evaporator module and a condenser module. The condenser module is arranged radially outboard of and axially overlaps the bypass flowpath. The core flowpath extends sequentially through the core compressor section, the core combustor section, the core turbine section, the evaporator module and the condenser module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • RTX CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Snyder, Jacob C East Haddam, US 14 5
Sobanski, Jon E Glastonbury, US 61 39
Terwilliger, Neil J Cheshire, US 61 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00