Integrated ethanol and pretreatment facility

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12215304
APP PUB NO 20230357678A1
SERIAL NO

18305805

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated facility for the co-production of ethanol and the pretreatment of impure vegetable oils, waxes and (animal) fats is provided. A by-product from the ethanol plant, such as distillers corn oil or distillers sorghum oil, can be directly refined on site to remove contaminants such as metals, phospholipids and inorganic anions, to enable use as ready feedstocks for a renewable diesel hydrotreatment plant. The utility of the ethanol plant infrastructure can be directly harnessed to pretreat and purify a variety of impure feedstock materials. The pretreatment reduces catalytic poisoning in the reduction process at refining facilities during the synthesis of renewable diesel. By-products of the pretreatment process are recycled to various parts of the ethanol plant for incorporation into the animal feed(s) produced by the ethanol plant or incorporated into the existing wastewater treatment and disposal system within the ethanol plant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CHEMTOR, LP

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gossett, Wade Buda, US 1 0
Kohl, Scott D Maize, US 8 72
Mohamed, Rana K Austin, US 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00