Apparatus and method for processing roughages

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12213499
APP PUB NO 20190373919A1
SERIAL NO

16432687

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for roughage processing includes a first platform for placing of a first type of roughage, a first cutting mechanism for processing the first type of roughage, a first chain for cutting the first type of roughage from the first platform to the first cutting mechanism; and a second platform, a second cutting mechanism, and a second chain for performing similar tasks with a second type of roughage. The first chain and the second chain are driven at a different speed to provide concurrent cutting of the first and second types of roughages at different cut sizes. The apparatus further includes a conveyor for concurrently collecting the first type of roughage and the second type of roughage after respective processing by the first cutting mechanism and the second cutting mechanism for effective blending of the two types of roughages, each of which has been cut differently to obtain its optimum particle size for ruminant consumption.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Patterson, R C Kim, US 5 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 4, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00