Generator for driving a predefined load

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12212184
APP PUB NO 20230421003A1
SERIAL NO

18214982

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the present invention are directed to a generator for connecting to a predefined load, where the generator is designed and constructed to meet one or more requirements of the predefined load. In specific embodiments the one or more requirements include providing a minimum output voltage while starting the predefined load at or above ambient temperature and providing an output voltage that does not exceed an upper voltage limit while being driven at full speed without any load current at or below ambient temperatures, while maintaining high efficiency under a specified full load running condition and keeping the overall cost and size of the generator low.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IN MOTION US LLC3157 STATE STREET BLACKSBURG VA 24060

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, Gerald W Radford, US 13 182
Coulson, David M Radford, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00