Medium voltage switchgear or control gear

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12212124
APP PUB NO 20230029540A1
SERIAL NO

17965229

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A medium voltage switchgear or control gear includes at least one first compartment; a cable compartment; a plurality of main components; and a plurality of auxiliary components. The plurality of main components is housed in at least one part of the at least one first compartment. The plurality of auxiliary components is housed in the cable compartment. The second connector is configured to connect to the first connector to connect a cable in the cable compartment to a component of the plurality of main components. The cable compartment is configured to be disconnected from the at least one first compartment and wherein the cable compartment is configured to be spatially separated from the at least one first compartment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB SCHWEIZ AGBRUGGERSTRASSE 66 BADEN 5400

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cernohous, Josef Jamne nad Orlici, CZ 18 17
Javora, Radek Hrusovany u Brna, CZ 35 64
Kozel, Tomas Brno, CZ 30 52
Skuci, Michal Brno, CZ 8 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00