Connector

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12212094
APP PUB NO 20220416471A1
SERIAL NO

17844890

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector includes: an electric wire; a terminal connected to the electric wire; a housing having a housing space to house a connection portion of the electric wire and the terminal; a seal member to seal an opening portion of the housing space to isolate the connection portion housed in the housing space from an outside; and a heat storage member located in the housing space.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAZAKI CORPORATION4-28 MITA 1-CHOME MINATO-KU TOKYO 108-8333

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujita, Hiroshi Kakegawa, JP 287 3126
Kanamori, Takanori Kakegawa, JP 12 14
Mizuno, Hideki Kakegawa, JP 37 400
Shirosaka, Kazuki Kakegawa, JP 9 0
Takahashi, Toshiharu Kakegawa, JP 91 999
Tanaka, Hiroyuki Kakegawa, JP 980 8259
Yamaguchi, Yasuhiro Kakegawa, JP 130 2200

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00