Feedforward determination of a driving signal for a piezo actuator

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12210267
APP PUB NO 20220334452A1
SERIAL NO

17753545

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for determining a set-point voltage for a piezoelectric actuator system to achieve a desired optical response of the piezoelectric actuator system, such as an optical power. The method is based on a mathematical model, OP(V,T,n) describing a relationship between the applied voltage and the optical response. Calibration and use of the model involves determining a transition time count value. During use, e.g. at given intervals, the model is updated based on actual values of the temperature and the transition time count value. The set-point voltage required to achieve a desired optical response is determined based on the updated model and the set-point voltage is applied to the piezoelectric actuator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POLIGHT ASA3188 HORTEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dalod, Antoine Robert Marie Horten, NO 1 0
Henriksen, Lars Tønsberg, NO 32 520
Tallaron, Nicolas Neuville sur Saône, FR 13 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00