Residual stress measurement method of curved surface block

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12209926
APP PUB NO 20230088293A1
SERIAL NO

18059962

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A residual stress measurement method of a curved surface block includes steps of: locating a point at which a to-be-detected curved surface of a curved surface block has a highest curvature as a to-be-detected point; applying an instrument integrating an X-ray light source and a detector, measuring the to-be-detected point by using an X-ray diffraction theory, and analyzing and calculating, in combination with a sin2 Ψ method, a strain value measured by using the instrument; and calculating, in combination with material property measurement data of the curved surface block material, a residual stress by introducing a curved surface block residual stress calculation model.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
METAL INDUSTRIES RESEARCH & DEVELOPMENT CENTRE1001 KAONAN HIGHWAY KAOHSIUNG 81160

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Zong Rong Kaohsiung, TW 1 0
Tsai, Hsiu An Kaohsiung, TW 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00