Piezoelectric device having a support with a neutral fiber

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12209913
APP PUB NO 20220238784A1
SERIAL NO

17610406

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an embodiment a device includes a piezoelectric transducer element and a support connected mechanically to each other thereby forming an assembly, wherein the piezoelectric transducer element and the support are configured to be jointly deformed under an action of a first force, wherein the support includes a neutral fiber arranged inside the support, the neutral fiber configured to not undergo any change in length during a bending of the assembly, and wherein the piezoelectric transducer element includes a ferroelectric polymer layer or a layer having a composite material including a ceramic material and a piezoelectric polymer matrix.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TDK ELECTRONICS AGMUNICH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hedhili, Amira Graz, AT 3 2
Kappert, Sandro Graz, AT 4 1
Sax, Stefan Graz, AT 10 2
Taferner, Dominik Preding, AT 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00