Adjustable gas block for an indirect gas operated firearm

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12209834
APP PUB NO 20230304756A1
SERIAL NO

18200383

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A firearm including a barrel, receiver, indirect gas system and an adjustable gas block designed to interface with the indirect gas system is provided. Four indexable positions of adjustment are provided for on the adjustable gas block. Positions of adjustment are selected based on the use of a silencer, use of under-powered ammunition, the presence of un-burnt powder and debris in the host firearms operating system, or if the weapon is being fired under “ideal” circumstances. The provided gas block is designed to function with an indirect gas operating system. Excess gas from the operating system is not vented from the gas block thereby generating excess flash and sound. No tool is required to manipulate the adjustment mechanism of the gas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LWRC INTERNATIONAL LLC815 CHESAPEAKE DRIVE CAMBRIDGE MD 21613

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gomez, Jesus S Trappe, US 60 2466

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00