Hydrogen production and conveyance system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12209567
APP PUB NO 20220056881A1
SERIAL NO

17519530

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method by which energy from ocean waves is converted into hydrogen, and that hydrogen is used to manifest electrical and mechanical energies by an energy consuming device. A portion of the generated electrical power is communicated to water electrolyzers which produce oxygen and hydrogen from water as gases. At least a portion of the generated hydrogen gas is transferred to a transportation ship via a hose-carrying, remotely operated (or otherwise unmanned) vehicle, and subsequently transferred to an energy-consuming module or infrastructure, where a portion of the hydrogen is consumed in order to manifest a generation of electrical energy, a mechanical motion, and/or a chemical reaction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • LONE GULL HOLDINGS, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Moffat, Brian Lee Portland, US 105 609
Place, Daniel William Portland, US 35 153
Sheldon-Coulson, Garth Alexander Portland, US 78 254
Thorson, Ivar Lee Portland, US 13 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00