Heavy duty transom for structural support systems

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12209421
APP PUB NO 20220268037A1
SERIAL NO

17626231

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This publication relates to a tubular transom in particular for temporary structures, such as scaffolding or false work and similar structure, having ends configured to be connected to verticals at node sections arranged at intervals on the verticals. Each end of the transom comprises a fastening device with an integrated profile part, releasably attached to the tubular transom in an opening at the ends of the tubular transom. The transom comprises a first and at least second elongate, parallel and hollow tube elements, interconnected at least at each end by intermediate integrated web plates, rigidly fixed to said at least two tube elements. A contact surface of the opening in the first tube, is transversally arranged relative to one or more web plates. A contact surface of the opening in the second tube is transversally arranged relative to one or more web plates. The opening at the ends of the transom having at least partly a complimentary shape.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FRICO AS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fritzøe, Steven Tønsberg, NO 2 2
Zarb, Danny Belmont, AU 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00