Geodesic dome structure including vertical doorway

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12209402
APP PUB NO 20240175252A1
SERIAL NO

18522254

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A geodesic dome structure having a doorway in a vertical plane, includes: a single upper pentagonal planar member provided at a topmost position; five upper hexagonal planar members with vertices thereof meeting facing vertices of the upper pentagonal planar member; five middle pentagonal planar members disposed between the upper hexagonal planar members, with upper vertices thereof meeting corresponding vertices of the upper hexagonal planar member; five middle hexagonal planar members disposed between the upper hexagonal planar members and the middle pentagonal planar members; a single lower doorway hexagonal planar member disposed between the middle hexagonal planar member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEE CHAN YOUNGSEOUL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Chan Young Seoul, KR 12 147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00