Inflatables-based process for creating multi-layer internal reinforcements

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12208604
APP PUB NO 20240051262A1
SERIAL NO

17818532

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structural component for a vehicle and a process and system for forming the structural component. A first cavity is formed in a first hollow passage between a first bladder and an interior surface of a component forming the structural component. A first structural reinforcement layer is formed in the first cavity by filling the first cavity with a first polymer resin and foaming the first polymer resin to form a first polymer resin foam. A second cavity is formed in the first hollow passage and a second structural reinforcement layer is formed in the second cavity by filling the second cavity with a second polymer resin and foaming the second polymer resin to form a second polymer resin foam.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOARD OF TRUSTEES OF THE UNIVERSITY OF ILLINOIS352 HENRY ADMINISTRATION BUILDING 506 S WRIGHT STREET URBANA IL 61801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Krishnan, Girish Mahomet, US 4 19
Mankame, Nilesh D Ann Arbor, US 172 2155
Sun, Ruoyu Champaign, US 16 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 28, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 28, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 28, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00