Target supply system, extreme ultraviolet light generation apparatus, and electronic device manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12207382
APP PUB NO 20230284364A1
SERIAL NO

18163023

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A target supply system includes a target generation unit configured to generate a liquid target substance by melting a solid target substance at an inside thereof, and output the liquid target substance; an input mechanism configured to introduce the solid target substance to the target generation unit; a heater arranged at the target generation unit; a sensor configured to detect a temperature of the target generation unit; and a processor configured to control an input timing at which the solid target substance is introduced to the target generation unit, perform feedback control on the heater based on a present temperature detected by the sensor, and perform feedforward control on the heater based on the input timing while performing feedback control on the heater.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GIGAPHOTON INC400 OAZA YOKOKURASHINDEN OYAMA-SHI TOCHIGI 323-8558

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Oue, Nozomu Oyama, JP 1 0
Shiraishi, Yutaka Oyama, JP 48 214

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00