Method, terminal device, base station, computer readable medium for measuring cross-link interference, and methods and apparatuses for random access preamble allocation, determination, and data transmission

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12206625
APP PUB NO 20220385439A1
SERIAL NO

17817958

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A terminal device and a method for measuring cross-link interference. The method includes receiving time-frequency resource configuration information from a base station, wherein the time-frequency resource configuration information includes configuration information of measurement time-frequency resources for measuring the cross-link interference. The method also includes determining measurement time-frequency resources for measuring the cross-link interference according to the time-frequency resource configuration information. The method further includes measuring the cross-link interference on the measured time-frequency resources and feeding back the measurement result of the cross-link interference to the base station.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAMSUNG ELECTRONICS CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Peng Beijing, CN 125 1710
Qian, Chen Beijing, CN 275 1703
Su, Di Beijing, CN 67 597
Yu, Bin Beijing, CN 738 19031
Zhang, Chuang Beijing, CN 44 199

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00