Metal-oxygen primary reserve batteries for munitions and the like applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12206084
APP PUB NO 20230261286A1
SERIAL NO

18111684

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metal-oxygen battery including: a battery core, gas container and a movable member. The battery core including a metal anode; a non-aqueous electrolyte; a porous cathode; and terminals for providing electrical power from the battery core. The gas container being configured to hold a pressurized gas at least partially comprising oxygen. The movable member being configured to be movable from a non-activated position in which the pressurized gas in the container is sealed from entering the porous cathode and an activated position in which the pressurized gas flows into the porous cathode to activate the battery core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OMNITEK PARTNERS LLCRONKONKOMA NY 11779

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alvare, Javier Sandy, US 12 41
Rastegar, Jahangir S Stony Brook, US 404 2734

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00