Modeling system for energy systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12205055
APP PUB NO 20200381919A1
SERIAL NO

16995478

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for modeling networks of electricity supply and demand includes a first user interface, a second user interface, a database, a controller, and a memory including instructions. The database includes a data set defining nodes and domains, each node being a geographic area with defined electricity supply and demand, each plan including instructions related to a node for managing energy infrastructure and supply and demand changes. The controller is configured to: receive a first request to create a first plan for a first node of a collection; receive plan instructions for the first plan; receive a second user request to create a second plan for a second node of the collection; receive a plan instruction to interconnect the first node with the second node in the first plan; generate a forecast including a projected value for an energy infrastructure variable; and display the forecast.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Meier, Paul J Stoughton, US 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00