Hydrogen supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12203602
APP PUB NO 20220397238A1
SERIAL NO

17776302

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrogen supply system is configured to supply hydrogen to a fuel-cell vehicle by using a receptacle for hydrogen transport, and includes: a filling unit provided at a hydrogen filling facility and configured to fill the receptacle with hydrogen; a management unit configured to calculate a transport timing at which the hydrogen-filled receptacle is transported to a business facility that operates the fuel-cell vehicle; a transport unit configured to transport the hydrogen-filled receptacle to the business facility in accordance with the transport timing; and a disposition unit configured to dispose the hydrogen-filled receptacle transported to the business facility at a place to which the fuel-cell vehicle is capable of accessing to have a refill of the hydrogen in the business facility.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE STEEL CORPORATION2-3 UCHISAIWAI-CHO 2-CHOME CHIYODA-KU TOKYO 100-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hasegawa, Takuya Tokyo, JP 121 687
Ishikawa, Nobuyuki Tokyo, JP 90 578
Kadota, Kotaro Tokyo, JP 2 1
Kuno, Hiroki Tokyo, JP 1 0
Matsubara, Kazuki Tokyo, JP 25 239
Nagao, Akihide Tokyo, JP 17 70
Okano, Hiroshi Tokyo, JP 125 1210
Takagi, Shusaku Tokyo, JP 37 376
Takano, Toshio Kanagawa, JP 35 248
Yamaguchi, Norikazu Tokyo, JP 2 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00