Aircraft power plant with detonation combustion tube

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12203429
APP PUB NO 20240200510A1
SERIAL NO

18066302

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aircraft power plant, has: a combustion engine having an outlet outputting combustion gases; a turbine downstream of the combustion engine; a detonation combustion tube fluidly connecting the combustion engine to the turbine; a member having an open position in which the outlet of the combustion engine is fluidly connected to the turbine and a closed position in which the combustion engine is fluidly disconnected from the turbine; a fuel injector fluidly connected to the detonation combustion tube; an igniter operatively connected to the detonation combustion tube; and a controller operatively connected to the fuel injector and to the igniter, the controller configured to, in response to receiving of a command: inject fuel into the detonation combustion tube via the fuel injector, and once the member is in the closed position, power the igniter to ignite a mixture of the combustion gases and the fuel into the detonation combustion tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRATT & WHITNEY CANADA CORP1000 MARIE VICTORIN BLVD LONGUEUIL QU J4G 1A1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bousquet, Michel Longueuil, CA 34 44
Nguyen, Kevin Montreal, CA 55 251
Plamondon, Etienne Candiac, CA 22 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00