Polymer-modified asphalt with wax additive

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12202945
APP PUB NO 20220177669A1
SERIAL NO

17671564

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An improved method forms and employs a wax to modify asphalt. The method includes: (a) selecting a solid polymeric material, (b) heating the solid polymeric material in an extruder to produce a molten polymeric material, (c) filtering the molten polymeric material, (d) placing the molten polymeric material through a chemical depolymerization process in a reactor to produce a depolymerized polymeric material, and (e) adding the depolymerized material to a pre-wax mixture to produce a polymer-modified asphalt. The addition of wax reduced the mixing time necessary to achieve improved polymer dispersion compared to the control formulation modified bitumen and reduced the viscosity of the neat bitumen. Pre-polymer addition of wax is detrimental to most properties of the resulting modified asphalt. Post-polymer addition improved viscosity reduction, higher softening point and improved dimensional stability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GREENMANTRA RECYCLING TECHNOLOGIES LTD81 ELGIN STREET BRANTFORD N3S 5A1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Di, Mondo Domenic Brampton, CA 21 17
Guillon, Chris Brantford, CA 3 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00