Methods for improving gas phase polymerization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12202917
APP PUB NO 20220098332A1
SERIAL NO

17310699

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This disclosure relates to processes for producing polyolefins in a gas phase reactor using condensing agent(s) (CAs), and real-time calculation of the ratio of one type of CA to another CA within a CA composition. This disclosure provides methods for controlling condensed phase cooling in a gas phase reactor used to polymerize olefins. The polymerization may employ one or more polymerization catalysts to polymerize one or more olefin monomers, and may include introducing a first condensing agent and a second condensing agent in a ratio of first condensing agent to second condensing agent, which ratio is calculated by ascertaining a stick limit for a first condensing agent, calculating an equivalence factor relating the first condensing agent and a second condensing agent, ascertaining a total allowable condensing agent, and calculating a first amount of the first condensing agent removed and replaced by a second amount of the second condensing agent.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXXONMOBIL CHEMICAL PATENTS INCBAYTOWN TX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bernard-Brunel, Anne A Le Havre, FR 2 3
Greenhalgh, Brian R Houston, US 6 8
Impelman, Ryan W Houston, US 20 51
McGinnis, Aaron C Houston, US 5 3
Moebus, Joseph A Houston, US 6 4
Savatsky, Bruce J Kingwood, US 46 246

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00