Power management for fuel efficiency improvement of self-propelled windrower

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12202508
APP PUB NO 20240227834A1
SERIAL NO

18093452

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power management system and method for a work machine that receives real time data, computes current power requirements based on the real time data, computes an optimized engine speed based on the current power requirements and a desired reserve power, and informs an operator of the optimized engine speed. The system can predict upcoming power requirements based on real time and predictive machine data, and compute the optimized engine speed based on the current and upcoming power requirements and the desired reserve power. The system can also receive predictive data, and predict the upcoming power requirements based on the predictive and real time data. Predictive data can include topographical data and/or historical power-consumption data. The system can include an automatic mode where the system automatically adjusts engine speed to the optimized engine speed. The system can maintain a constant machine ground speed as it automatically adjusts engine speed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE MOLINE IL 61265

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Somarowthu, Mahesh Pune, IN 25 4
Usasz, Mitchell R Ottumwa, US 17 89
Vadnere, Mohan A Pune, IN 25 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00