Systems and methods for an automatic safety protocol in electrical tools

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12202097
APP PUB NO 20210187697A1
SERIAL NO

16756375

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a power tool and an automatic safety system communicatively coupled to the power tool. The automatic safety system includes one or more sensors disposed about the power tool, where the one or more sensors are configured to gather data about a safety parameter related to an operation of the power tool. The automatic safety system also includes a main detector configured to receive the data gathered by the one or more sensors. The main detector is configured to analyze the received data to determine whether to unlock the power tool for operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HILTI AKTIENGESELLSCHAFTFELDKIRCHER STRASSE 100 LI-9494 SCHAAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koschel, Christian Augsburg, DE 15 87
Looser, Markus Landsberg, DE 11 41
Schadoffsky, Olaf Landsberg, DE 5 29
Zhou, Xi Kaufering, DE 25 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00