Footwear strobel with bladder and lasting component and method of manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12201184
APP PUB NO 20240108102A1
SERIAL NO

18535087

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An article of footwear includes a strobel that has a polymeric bladder defining an interior cavity and configured to retain a fluid in the interior cavity. The polymeric bladder has a peripheral flange extending around at least a portion of a perimeter of the interior cavity. A tensile component is disposed in the interior cavity and is secured to opposing inner surfaces of the polymeric bladder. The peripheral flange defines a groove extending along the peripheral flange. The strobel also includes a lasting component configured to extend along the peripheral flange around the at least a portion of the perimeter of the interior cavity. The lasting component is secured to the peripheral flange. A method of manufacturing footwear that includes the strobel is disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIKE INCONE BOWERMAN DRIVE BEAVERTON OR 97005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Auyang, Arick Portland, US 17 44
Houng, Derek Portland, US 21 105
Meeker, Jason R Portland, US 24 98
Schmalzer, Eric A Portland, US 9 26
To, Jeffrey S Portland, US 15 58
Weston, Geoffrey A Beaverton, US 9 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 21, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00