Lens and lens assembly including the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12200338
APP PUB NO 20240205528A1
SERIAL NO

18308025

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lens includes an optical portion and a flange portion. The optical portion has a greater length along a first axis direction than a second axis direction, and the first axis direction and the second axis direction are perpendicular to an optical axis and perpendicular to each other. A flange portion extending along the first axis direction includes a first inclined portion connected to a first surface of the optical portion and a second inclined portion connected to a second surface of the optical portion. The second inclined portion protrudes in an optical axis direction, relative to the second surface of the optical portion, in an area in which the second inclined portion is connected to the second surface of the optical portion. A light absorption layer is disposed in the area in which the second inclined portion is connected to the second surface of the optical portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRO-MECHANICS CO LTDGYEONGGI DO KOREA SUWON SUWON GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baek, Kyung Ho Suwon-si, KR 2 0
Lee, Jong Gi Suwon-si, KR 21 22
Yang, Dong Shin Suwon-si, KR 48 192

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00