Cascaded phase interpolator topology for quadrature-rate multilevel pulse amplitude modulation data sampling

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12199619
APP PUB NO 20250007523A1
SERIAL NO

18214704

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A receiver includes a multi-phase clock generator to generate phases of a clock signal and a global phase interpolator (PI) circuit coupled to the multi-phase clock generator and to clock and data recovery (CDR) circuitry. The global PI circuit generates initial-adjusted phases from the phases of the clock signal based on a control signal received from the CDR circuitry. A first local PI receives the initial-adjusted phases of the clock signal and applies a first fixed phase shift to the initial-adjusted phases to generate first final-adjusted phases of the clock signal that are useable to sample a first level of multiple levels of a pulse-amplitude-modulated (PAM) data stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NVIDIA CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abadi, Ofek Nahariya, IL 7 0
Wolkovitz, Omer Kfar Saba, IL 4 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00