Multiple supply voltage tracks and standard cells

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12199609
APP PUB NO 20240223163A1
SERIAL NO

18442655

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device including a first supply voltage track, a second supply voltage track, a first reference track, a first standard cell, and a second standard cell. The first supply voltage track is configured to provide a first voltage and the second supply voltage track is configured to provide a second voltage that is greater than the first voltage. The first standard cell is configured to be electrically connected to the first supply voltage track to receive the first voltage and electrically connected to the first reference track. The second standard cell is configured to be electrically connected to the second supply voltage track to receive the second voltage and electrically connected to the first reference track.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Wen-Hao Hsin-Chu, TW 112 704
Ou, Hung-Chih Kaohsiung, TW 26 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00