Power transistor thermal control via integrated thermoelectric device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12199607
APP PUB NO 20240258999A1
SERIAL NO

18103753

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure introduces integrated circuits and related manufacturing methods, wherein each integrated circuit includes an electronic device and a thermoelectric circuit. The electronic device is formed in and/or over a semiconductor substrate. The thermoelectric circuit includes thermopiles formed in and/or over the semiconductor substrate and electrically connected in series. The thermoelectric circuit is configured to modulate operation of the electronic device in response to a potential produced by the plurality of thermopiles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATED12500 TI BOULEVARD M/S 3999 DALLAS TX 75243

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blanco, Andres Arturo Garland, US 7 14
Chauhan, Ankur Kharapur, IN 24 70
Edwards, Henry Litzmann Garland, US 122 503
Lazaro, Orlando Cary, US 34 119
Murthy, Kushal D Bangalore, IN 8 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00