Dielectric gap-filling process for semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12198974
APP PUB NO 20230360960A1
SERIAL NO

18351985

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device and a method of forming the same are provided. The method includes forming a trench in a substrate. A liner layer is formed along sidewalls and a bottom of the trench. A silicon-rich layer is formed over the liner layer. Forming the silicon-rich layer includes flowing a first silicon precursor into a process chamber for a first time interval, and flowing a second silicon precursor and a first oxygen precursor into the process chamber for a second time interval. The second time interval is different from the first time interval. The method further includes forming a dielectric layer over the silicon-rich layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTDHSINCHU 300-78

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Cheng-I Hsinchu, TW 61 464
Tang, Bang-Tai New Taipei, TW 14 88

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 14, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00